Washington Marina Homepage

ADDITIONAL LINKS
NEWS ARCHIVES
EVENT ARCHIVES



Phase II Dock Renovations underway!

WASHINGTON D.C. -- August 9, 2003 -- The second phase of dock renovations is now underway at The Washington Marina. This phase includes demolition of the original wooden fixed-pier docks and replacement with 60 additional floating slips from Radisson Design.

Bob Stickell, the marina's general manager stated that, "We are very excited to see the second phase begin. We are looking forward to having the entire marina renovated by the end of September, 2003."

The second phase includes slips from 30' to 100'. Questions concerning slip availability should be directed to slips@washingtonmarina.com or by calling the marina at 202-554-0222.


YACHT CHARTERS  |   CHELSEA BOUTIQUE  |   HISTORY  |   SUPPORT/WARRANTY INFORMATION

THE WASHINGTON MARINA COMPANY

1300 MAINE AVENUE, S.W.
WASHINGTON D.C. 20024-2420
Main: 202.554.0222    Fax: 202.484.1950

Hosted, designed and developed by Cyberonyx International